Commercial · EV charging

Consett & Stanley — 3-charger fleet EV install for building merchant

3× Ohme 22 kW three-phase EV chargers installed at a building merchant's Consett yard. Northern Powergrid three-phase supply upgrade negotiated; OZEV Workplace Charging Scheme funded £1,050 (3× £350 per socket). Fleet of 6 Ford Transits transitioning to EV over 2 years.

Consett, DH8 · Completed February 2026 · Consett-based building merchant (name withheld)

Headline result

£4,800/yr fleet fuel cost saved per EV

Chargers installed
3 × 22 kW Ohme
OZEV grant
£1,050
NPg supply upgrade
Single to three-phase
Fleet EV transition
2 of 6 vehicles complete
Annual fuel saving (per EV)
£4,800
Three-charger Ohme commercial EV install at a Consett building merchant yard

System specification

3× Ohme ePod Commercial 22 kW three-phase tethered chargers. Northern Powergrid three-phase supply upgrade (60 A single-phase → 80 A three-phase) included via NPG quote process. Centralised Ohme Pro Hub for fleet management — driver authentication, charging session billing, real-time monitoring. Compatible with all Ford Transit/Custom EV models in the customer's fleet.

Property

Commercial trade counter + 8-vehicle fleet yard, 2008 build

The building merchant approached us in September 2025 having just bought their first 2 Ford Transit electric vans. The yard had single-phase 60 A supply — insufficient for 3 fast chargers running simultaneously. The first conversation focused on whether the supply could be upgraded economically before committing to the EV fleet transition.

We worked through the Northern Powergrid three-phase upgrade process — submitted a connection application in October, received quote within 14 days (£3,200 for the upgrade including 80 A three-phase supply, single new connection cubicle, swap-out of existing single-phase intake), upgrade completed in early November. Once the three-phase supply was confirmed, the EV charger install proceeded.

We specified the Ohme ePod Commercial 22 kW for the centralised Pro Hub fleet management — drivers swipe a fob to start a charging session, the system tracks per-vehicle kWh and bills back to fleet operating cost. The 22 kW rating gives a Ford Transit a full charge in 2 hours — comfortable overnight charging window for the next day's deliveries.

Install completed in 3 days: day 1 trenching for underground cabling from intake to charger plinths, day 2 charger mounting + electrical commissioning, day 3 OZEV Workplace Charging Scheme application + customer handover.

After 4 months of operation the 2 Ford Transits in the fleet are delivering approximately £4,800/year of fuel cost saving each vs the diesel vans they replaced. The customer is on track to transition the remaining 4 vans over the next 18 months. The Ohme Pro Hub data is being used to refine route planning — they now know the average daily kWh per route and can optimise vehicle assignments.

Our accreditations

Accredited, certified, and backed by independent standards

NICEIC Approved

D124458

Electrical contractor

Part P

Building Regs

Domestic electrical

SafeContractor

Approved

H&S accredited

ISO 9001

2015

Quality management

ISO 14001

2015

Environmental management

ISO 45001

2018

OH&S management

Established

1985

Family run for 40 years

NICEIC Approved

D124458

Electrical contractor

Part P

Building Regs

Domestic electrical

SafeContractor

Approved

H&S accredited

ISO 9001

2015

Quality management

ISO 14001

2015

Environmental management

ISO 45001

2018

OH&S management

Established

1985

Family run for 40 years

Every accreditation listed is independently verified. We carry the registration numbers — ask for any on request.

Want a quote for a similar install in Consett?

Free survey, fixed-price written quote, fully certified installation. We can typically deliver a designed proposal within 5-7 working days of the site visit.

Free, no-obligation survey Fixed-price written quote Fully-certified installation
Call Free quote WhatsApp