0% VAT on solar panels & battery storage until 31 March 2027

Case studies

Named North East installs — real KPIs, real properties

4 recent residential and commercial installs across 4 North East towns. Each case study includes the actual system specification, headline result, customer first name (anonymised surname) and supplementary KPIs.

4.2 kWp solar PV install on a Harraton, Washington semi-detached home
Residential · Solar + Battery
Washington, NE38

Harraton, Washington — 4.2 kWp solar + 5 kWh battery on 1970s semi

A south-east-facing 1970s semi in Harraton, Washington. The owner had been monitoring electricity prices for 18 months and wanted both bill reduction and partial energy independence. We sized a 10-panel 4.2 kWp system with a 5 kWh battery to maximise self-consumption.

Result

64% lower electricity bills

Mar 2026 Read full case
Tesla Powerwall 3 + Zappi charger retrofit on a Sunderland detached home
Residential · Battery + EV
Sunderland, SR3

Sunderland — Tesla Powerwall 3 + Zappi EV charger on 4-bed detached

A Tesla Powerwall 3 + Zappi v2 charger retrofit onto a 2008-build Sunderland detached. The owner already had 4 kWp solar from 2022 but wanted battery storage to capture more daytime export and EV smart-charging to maximise the Octopus Intelligent Go tariff.

Result

92% self-consumption + 7p/kWh EV fuel cost

Apr 2026 Read full case
Commercial solar PV array on a Cramlington primary school roof
Commercial · School solar
Cramlington, NE23

Cramlington — 48 kWp solar PV array for primary school

A 48 kWp commercial solar PV array installed at a Cramlington primary school. PSDS Round 4 funded 60% of capital. Annual generation 42,000 kWh — covering 36% of school electricity demand. Phased over Easter holidays to avoid term-time disruption.

Result

£8,400/yr electricity bill saving + 8 tonnes CO₂

Apr 2026 Read full case
Three-charger Ohme commercial EV install at a Consett building merchant yard
Commercial · EV charging
Consett, DH8

Consett & Stanley — 3-charger fleet EV install for building merchant

3× Ohme 22 kW three-phase EV chargers installed at a building merchant's Consett yard. Northern Powergrid three-phase supply upgrade negotiated; OZEV Workplace Charging Scheme funded £1,050 (3× £350 per socket). Fleet of 6 Ford Transits transitioning to EV over 2 years.

Result

£4,800/yr fleet fuel cost saved per EV

Feb 2026 Read full case

Our accreditations

Accredited, certified, and backed by independent standards

NICEIC Approved

D124458

Electrical contractor

Part P

Building Regs

Domestic electrical

SafeContractor

Approved

H&S accredited

ISO 9001

2015

Quality management

ISO 14001

2015

Environmental management

ISO 45001

2018

OH&S management

Established

1985

Family run for 40 years

NICEIC Approved

D124458

Electrical contractor

Part P

Building Regs

Domestic electrical

SafeContractor

Approved

H&S accredited

ISO 9001

2015

Quality management

ISO 14001

2015

Environmental management

ISO 45001

2018

OH&S management

Established

1985

Family run for 40 years

Every accreditation listed is independently verified. We carry the registration numbers — ask for any on request.

Want a case study for your installation?

We document selected installs with the customer's permission — your project could be next.

Free, no-obligation survey Fixed-price written quote Fully-certified installation
Call Free quote WhatsApp